Heartbeat #14
From: Team #3 (Dalat, Chris, Shadi, Fritz, and Tyler)
Heartbeat Msg: #14
To: ECE470/CSC402 Instructors
To email: net_heartbeat@renoir.csc.ncsu.edu
Subject: Heartbeat #14 From Team 3
Date: 12/06/02
1. Task Status:
- Revising the final RFC draft.
- Revising the final project report draft.
- Preparing for the presentation.
- We all survived the winter storm on Thursday.
- Q&A session is re-arranged to be on Saturday (12/7/02) at 3:00 p.m.
- The presentation is re-scheduled to Thursday of next week (12/12/02).
Below is the schedule file:
[Schedule]
2. Personnel Status:
Dalat Bui - Lead
Chris Brezovec - Vice Lead
K. Fritz Lehr - Webmaster
Shadi Eskama - Member
Tyler Humprey - Member
3. Risk Status:
Below is the risk table:
|
Rank Now
|
Rank History
|
Loss-Causing Event
|
Likelihood of the Loss-Causing
Event Occuring
|
Estimated Severity
(or Loss)
|
Current Risk
|
| 1 |
-
|
The due date for the final
report is coming very soon. However, it is difficult for us to find
enough time to revise the final project report draft. This is because
the finals and the pressure of graduation for some of us have kicked
in. Without spending enough time revising the report draft, it's possible
that we may not be able to produce a high quality final project report.
|
0.60
|
0.7
|
0.4
|
| 2 |
2,2,4
|
Revising the drafts is
getting more technical. Thus we'll have to spend a lot of time
"thinking" and reviewing the RFCs, especially at
technical sections. Since other classes demand the same amount of
work and many of us are under the pressure of finding jobs, this
can make the situation become very stressful - hopefully none of
us will become crazy by the end of the semester :( |
0.40
|
0.6
|
0.4
|
| 3 |
1,1,1
|
Very likely, we're not able to get the badges to
access the lab on Centennial campus 24/7, which does not give us
flexibility to learn about the AC devices and test the test cases.
|
0.98
|
0.3
|
0.2
|
| 4 |
4,4,2,1,4,3,2
|
Some ACs such as Redback
SMS 10000 and net.com SCREAM are still in the ordering process.
They may not be available any time soon. |
0.90
|
0.1
|
0.1
|
4. Problem List:
- Lab access and the equipment are not available but they are no longer
our concern.
- The winter storm caused the Q&A session and the presentation to
be re-scheduled.
5. Any other issues you wish to report, raise, address, ...
none at this time.
End-of-Msg
|