Heartbeat #14

From: Team #3 (Dalat, Chris, Shadi, Fritz, and Tyler)
Heartbeat Msg: #14

To: ECE470/CSC402 Instructors
To email: net_heartbeat@renoir.csc.ncsu.edu

Subject: Heartbeat #14 From Team 3

Date: 12/06/02

1. Task Status:

- Revising the final RFC draft.
- Revising the final project report draft.
- Preparing for the presentation.
- We all survived the winter storm on Thursday.
- Q&A session is re-arranged to be on Saturday (12/7/02) at 3:00 p.m.
- The presentation is re-scheduled to Thursday of next week (12/12/02).

Below is the schedule file:
[Schedule]

2. Personnel Status:
Dalat Bui - Lead
Chris Brezovec - Vice Lead
K. Fritz Lehr - Webmaster
Shadi Eskama - Member
Tyler Humprey - Member


3. Risk Status:

Below is the risk table:

Rank Now
Rank History
Loss-Causing Event
Likelihood of the Loss-Causing Event Occuring
Estimated Severity
(or Loss)
Current Risk
1
-
The due date for the final report is coming very soon. However, it is difficult for us to find enough time to revise the final project report draft. This is because the finals and the pressure of graduation for some of us have kicked in. Without spending enough time revising the report draft, it's possible that we may not be able to produce a high quality final project report.
0.60
0.7
0.4
2
2,2,4
Revising the drafts is getting more technical. Thus we'll have to spend a lot of time "thinking" and reviewing the RFCs, especially at technical sections. Since other classes demand the same amount of work and many of us are under the pressure of finding jobs, this can make the situation become very stressful - hopefully none of us will become crazy by the end of the semester :(
0.40
0.6
0.4
3
1,1,1

Very likely, we're not able to get the badges to access the lab on Centennial campus 24/7, which does not give us flexibility to learn about the AC devices and test the test cases.

0.98
0.3
0.2
4
4,4,2,1,4,3,2
Some ACs such as Redback SMS 10000 and net.com SCREAM are still in the ordering process. They may not be available any time soon.
0.90
0.1
0.1


4. Problem List:

- Lab access and the equipment are not available but they are no longer our concern.
- The winter storm caused the Q&A session and the presentation to be re-scheduled.


5. Any other issues you wish to report, raise, address, ...
none at this time.

 

End-of-Msg

 



This page was last updated on:
Friday, November 22, 2002 22:51
Copyright © 2002 by Team 3, All Rights Reserved.

WebSite contact: K. Fritz Lehr, E-mail: kflehr@unity.ncsu.edu, Tel: (919) 593-0162